Project Profile

Drago Wrap 60-Mil Soil Gas Barrier Helps Meet Illinois Vapor Intrusion Mitigation Requirements

Drago-Wrap-60-Mil-Drone-1200x630px

 

LOCATION: Illinois
PROJECT TYPE: Convenience Store
PROJECT SIZE: Approx. 10,000 sq ft
PRODUCTS: Drago® Wrap 60-Mil Soil Gas Barrier, DragoSeal® Tape, Drago® Mastic and Drago® Mastic Spray Grade


A new convenience store in Illinois required a vapor intrusion mitigation system designed to meet the State of Illinois’ 60-mil membrane requirements.

The project’s basis of design called for both a 60-mil membrane and spray-grade mastic, creating a need for a complete system capable of addressing the specified mitigation requirements while supporting a carefully detailed installation.

Drago Wrap 60-Mil Soil Gas Barrier was selected as the primary membrane to meet the state requirement, supported by Drago Mastic Spray Grade, Drago Mastic, and DragoSeal Tape to help maintain system continuity across seams, penetrations, and other critical details.

Drago-Mastic-Spray-Grade-Detail-1200x

Because the design called for spray-applied mastic, the installation required specialized application equipment and experience. A contractor within the Drago Certified Installer network was selected with the specialized equipment and experience necessary to properly apply Drago Mastic Spray Grade and complete the specified installation procedures.

Drago-Wrap-60-Mil-Smoke-Testing-1200x630px

Following installation, smoke testing was also performed as part of the project’s inspection and verification process, with a representative of the environmental consulting design team on site. This provided an additional means of evaluating the completed mitigation system before subsequent construction proceeded.

By combining Drago Wrap 60-Mil Soil Gas Barrier with compatible detailing accessories and a qualified installation approach, the project team was able to address the project’s specific vapor intrusion mitigation requirements with an integrated Drago system.

 

Why Teams Choose Stego®

  • Life of the Building™ Warranty: Drago Wrap Vapor/Gas Barriers and Retarders are supported by Stego’s industry-leading warranty for long-term protection beneath the slab.
  • Engineered, High-Performance Materials: Stego barrier solutions are designed for durability and peace of mind, delivering reliable performance in demanding construction and environmental conditions.
  • Installation Support: From product selection to installation guidance, Stego’s technical team works with project stakeholders to help ensure best practices and successful system installation.
  • 3rd Party Testing Verification: Drago Wrap Vapor Intrusion Barrier and Drago Wrap Soil Gas Barrier have external product certifications under IAPMO UES EC-047, Evaluation Criteria for Membrane Mitigation Barrier Systems Used for Methane Gas Mitigation. 

Need Help Selecting the Right System?

We’ve got you covered!

  • Brownfield Redevelopment Site Assessment – We can provide under-slab methodologies and other support.
  • Product Choices - Let’s figure out which Stego barrier system is right for you: sub-slab protection from moisture vapor, radon or VOC’s.
  • Installation Options - Evaluate the cost and benefit of different installation practices to determine what is best for your specific details.
  • Personalized Training - Get the latest product training or certified installer training.

Let's discuss your project needs.