Peninsula College’s campus is located on the Olympic Peninsula in the jaw-droppingly beautiful city of Port Angeles, Washington. This area is such a gem that ...
Beast® Screed is a fixed-elevation, point-to-point guide screed system that allows you to maintain floor levelness during the screeding operation. Set it and forget it. This eliminates the need to frequently re-establish grade to ensure floor elevation has not changed during the screeding operation as is typical with traditional wet-screed methods.
Start improving efficiency on your next job with Beast Screed.
Learn More“When there’s not a lot of plumbing and other punctures, a truck can be in and out easily in under 10 minutes. It saves us time and money. GCs say our pours are some of the flattest slabs they’ve seen. There’s no grinding. No fix-ups. Fewer trucks are waiting.”
Beast® Screed is a fixed-elevation, point-to-point guide screed system designed to replace common wet-screed methods.
Now concrete placement crews can utilize the Beast Screed System on elevated deck pours with Beast® Deck Foot.
Beast® Hook is a faster, easier way to set 2x4 overhead screeds. Locate it and lock it down.
Beast® Form Stake can be used with Beast® Foot as part of the Stego vapor barrier-safe forming system which meets ASTM E1643 requirements. Preventing punctures in the vapor barrier. Beast Form Stake can also be used with Beast Foot and Beast Hook as a vapor barrier-safe 2x4 screed system.
Peninsula College’s campus is located on the Olympic Peninsula in the jaw-droppingly beautiful city of Port Angeles, Washington. This area is such a gem that ...
At the Graton Casino in Rohnert Park, California, the one thing they didn’t want to gamble on with their new expansion was a moisture problem. For Urata & Sons Concrete, Inc, this meant...
The Vander Linden brothers just have to glance up the street to see how the pour is going. Are the concrete trucks stacking up? Are the concrete trucks rotating in-and-out every 10 minutes?...